Zero electricity charges* for your home, on the competitive leg
Zero electricity charges* for your home, on the competitive leg
Zero standing charges
No upfront payment
free of any initial equipment and installation costs
Covering the remaining costs with repayment in up to 120 monthly installments
- through long-term credit with a consumer loan, on preferential terms from a cooperating banking institution.
- Zero competitive charges with the possibility of avoiding charges for electricity consumption that is not offset through Net Metering
Reduced regulated tariffs
We undertake the whole process and the on-site inspection is performed by us free of charge. This includes the design and subsidy, the equipment and installation, without any involvement on your part! Ensure full funding from Protergia for the equipment and installation of the P/V system and the battery
Support for the submission of the application to the "Photovoltaics on the Roof" program
(for beneficiaries of the action-ΥΠΕΝ/ΥΔΕΝ/47129/720/28-04-2023)
*Full coverage of energy needs, if the optimal technical solution proposed is followed. 100% discount for the first 1,000kWh/year of consumption outside energy metering.
Ensuring energy autonomy, with minimal to zero dependence on the electricity grid
FREE preventive maintenance every year until repayment of installments
Contributing to environmental protection by reducing the CO2 footprint
FREE Smart Meter installation (for the smooth operation of the PV)
Use of top-of-the-line equipment with a 2-year warranty
FREE equipment insurance for 1 year
FREE support for operation & maintenance (contact for reporting problems/ malfunctions)
FREE Installer's Declaration of Responsibility (revised after installation of PV)
Supporting documents for natural persons:
(For the period of Adjustment Clause suspension, pursuant to Article 138, L. 4951/2022)
Protergia has selected a network of experienced associates and will propose the best package to suit your individual needs.
Photovoltaics
Manufacturers: Trina TRINA - VERTEX S / Luxor LX-415M/108 HC PERC MBB (Mono)
Nominal power: 415WP - 430WP
Guarantee: 15 years
Production Guarantee: 25 years
Other equipment (bases, etc.): FREE OF CHARGE
Construction Guarantee: 15 years
Power Converters: HUAWEI / SUNGROW / GOODWE
Converter warranty: 10 years
Battery
Manufacturers: HUAWEI / SUNGROW / BYD
Storage system capacity: 3KWh - 10KWh
Competitive charges with effect from 01.08.2022
(For the period of Adjustment Clause suspension, pursuant to Article 138, L. 4951/2022)
Month of Consumption | Standing charges (€/month) | Energy tariff (€/kWh) | State Subsidy through the Energy Transition Fund (€/kWh) | Final Pricing of Power Supply after the State Subsidy (€/kWh) | Adjustment Clause | Invoice characteristics | |||
Without attaining energy saving target | Attaining energy saving target | Without attaining energy saving target | Attaining energy saving target | ||||||
July 2023 | 0.00 | 0.11150 | To be announced | It will arise after the announcement of the State subsidy | Not | It concerns customers who maintain an energy offsetting contract and a contract for the supply & installation of PV and battery with Protergia | |||
applicable. | |||||||||
-100% discount on the energy tariffs in the competitive leg for the first 1,000kWh/year that may be consumed outside the energy offset * | |||||||||
-No standing charges | |||||||||
-With full participation in state subsidies | |||||||||
-Without adjustment clause even after suspension | |||||||||
-Without Guarantee, with standing order | |||||||||
-Free myprotergia service | |||||||||
-Available also to Social Residential Tariffs A & Social Residential Tariffs B customers |
*The 100% discount is attributed to the first 1,000 kWh/year, which refer to any energy absorbed by the power grid and not offset against the energy generated by the battery-powered photovoltaic system. More information can be found in the Supply Contract.
Charges
The cost of a competitive arm includes energy supply as part of Daily Energy Planning, the charges for the incremental bills (Bill 2, Bill 3), the charges for losses of the Greek electricity distribution grid, the charge based on weighted variable cost of thermal conventional power stations (Special Account Charge under Article 143 L.4001/2011), the charging of charge representatives for the Subaccount of Electricity Market of the Special Account of R.E.S and High Performance Electricity and Heat Co-generation Station of the Interconnected System and Grid (Article 23 L. 4414/2016) and the costs of the Sufficient Power Guarantee Mechanism, as defined in the Code of Electricity Transactions (decision by RAE 56/2012, Government Gazette B 104/2012), and laid down in the applicable legislation.
Competitive charges outside the Suspension period.
(For the period outside the Adjustment Clause suspension, pursuant to Article 138, L. 4951/2022)
With Protergia Home Helios Value you will continue not to be charged an adjustment clause even after the lapse of the suspension period referred to in Article 138, L.4951/2022. For the period outside the suspension of the adjustment clause, pursuant to article 138, L.4951/2022, the calculation of the Variable Pricing of Power Supply is based on the Weighted Market Price each month of the consumption period in €/MWh.
Fill in your details to get the offer!