Participation in State Subsidies
The Protergia Charge Home Energy MVP is specifically designed for domestic customers and electric car owners, offering unique privileges:
Participation in State Subsidies
Without Adjustment Clause*
100% Green Electricity for your household & electric car!
Free myprotergia:
Consumption control is in your hands!
With a Final Pricing of Power Supply after the State Subsidy from €0.09/kWh
(for January consumptions)
Without Withdrawal Clause
No guarantee
with payment via a standing bank account order.
High level service
Get €75 free bonus in your 1st bill making your application online by filling out the form below
Protergia Net Metering 5% discount on the cost of installing a roof-based PV system!rgia Net Metering 5% discount on the cost of installing a PV system on the roof!
Protergia Home Insurance Free coverage in your household contents, up to € 5.000/year
* Pursuant to article 138, Law 4951/2022, the electricity supply charges of the present variable energy tariff with an adjustment clause are not applied for consumptions during the period from 01.08.2022 until 01.07.2023 (as possibly extended or reduced by a recent regulation)and the fixed electricity supply charges are to be reported on a monthly basis, until the 20th day of the month preceding the month of application.
(For the period of Adjustment Clause suspension, pursuant to Article 138, L. 4951/2022)
Month of Consumption | Standing charges (€/month) |
Daytime Energy (€/kWh) |
Nighttime Energy (€/kWh) |
State Subsidy through the Energy Transition Fund (€/kWh) |
Final Pricing of Daytime Power Supply after the State Subsidy (€/kWh) |
Final Pricing of Nighttime Power Supply after the State Subsidy (€/kWh) | Adjustment Clause | |||
Without attaining energy saving target | Attaining energy saving target | Without attaining energy saving target | Attaining energy saving target | Without attaining energy saving target | Attaining energy saving target | |||||
December 2022 | 5.00 | 0.36800 | 0.36280 | 0-500 kWh | 0-500 kWh | 0-500 kWh | Not applicable | |||
0.22100 | 0.14700 | 0.14180 | ||||||||
501-1000 kWh | 501-1000 kWh | 501-1000 kWh | ||||||||
0.17100 | 0.22100 | 0.19700 | 0.14700 | 0.19180 | 0.14180 | |||||
>1000 kWh | >1000 kWh | >1000 kWh | ||||||||
0.08100 | 0.13100 | 0.28700 | 0.23700 | 0.28180 | 0.23180 |
The above charges do not include VAT 6%
Charges
The cost of a competitive arm includes energy supply as part of Daily Energy Planning, the charges for the incremental bills (Bill 2, Bill 3), the charges for losses of the Greek electricity distribution grid, the charge based on weighted variable cost of thermal conventional power stations (Special Account Charge under Article 143 L.4001/2011), the charging of charge representatives for the Subaccount of Electricity Market of the Special Account of R.E.S and High Performance Electricity and Heat Co-generation Station of the Interconnected System and Grid (Article 23 L. 4414/2016) and the costs of the Sufficient Power Guarantee Mechanism, as defined in the Code of Electricity Transactions (decision by RAE 56/2012, Government Gazette B 104/2012), and laid down in the applicable legislation.
(For the period outside the Adjustment Clause suspension, pursuant to Article 138, L. 4951/2022)
Month of Consumption | Standing charges (€/μήνα) |
Energy Day tariff (€/kWh) |
Energy Night tariff (€/kWh) |
State Subsidy through the Energy Transition Fund (€/kWh) |
Final Pricing of Power Day Supply after the State Subsidy (€/kWh) |
Final Pricing of Power Night Supply after the State Subsidy (€/kWh) |
|||
Without attaining energy saving target | Attaining energy saving target | Without attaining energy saving target | Attaining energy saving target | Without attaining energy saving target | Attaining energy saving target | ||||
June 2023 | 5,00 | 0,18490 | 0,17970 | 0-500 kWh | 0-500 kWh | 0-500 kWh | |||
0,01500 | 0,16990 | 0,16470 | |||||||
>500 kWh | >500 kWh | >500 kWh | |||||||
- | 0,01500 | 0,18490 | 0,16990 | 0,17970 | 0,16470 |
The above charges do not include VAT. 6%. It shall apply to new applications up to 31.03.2023 for a 12-month contract
Charges and discounts regard the competitive side of the tariff, provided that the supplier's right to apply pricing adjustment conditions is not activated, as foreseen in the Supply Request.
Fill in your details to get the offer!