MYTILINEOS Group enters the electricity production & trading market for the first time through its two subsidiaries – MYTILINEOS POWER GENERATION & SUPPLY S.A. and MYTILINEOS HELLENIC WIND POWER S.A. The Group’s involvement in the energy sector comprises plans for energy investments concerning two power plants and numerous RES projects (mainly wind farms).
Entry into operation of the 17 MW Sidirokastro Wind Farm, located at the Prefecture of Serres (Northern Greece).
.
Construction contract is signed for the gas-fired combined cycle plant (CCGT) located at the Energy Complex of Ag. Nikolaos (Viotia).
The High Efficiency Combined Heat and Power plant (CHP/High Efficiency CHP) is connected to the Greek national grid.
Construction is launched for the gas-fired combined cycle thermal plant (CCGT) in Ag. Theodoroi (Korinthia).
MYTILINEOS Group concludes with Enel an agreement for the acquisition of the 50.1% stake held by ENDESA SA in Endesa Hellas. With this agreement, MYTILINEOS Group becomes the sole shareholder of Endesa Hellas, which is renamed Protergia S.A., and strengthens its position as the largest independent power producer in Greece.
The CCGT plant in Ag. Nikolaos (Viotia) enters into commissioning.
On 01/03/2011 Protergia moved at the new state-of-the-art Headquarters of MYTILINEOS Group in 8 Artemidos Street, Maroussi.
The CCGT plant of Ag. Nikolaos (Viotia) enters into commercial operation.
The CCGT plant of Ag. Theodoroi (Korinthos) enters into commissioning.
3 Photovoltaic Parks totalling 11,5 MW in the regions of Arta, Viotia and Aitoloakarnania enter in operation.
The CCGT plant in Ag. Theodoroi (Korinthia) enters into commercial operation.
Acquisition of the company MOVAL S.A., whose subsidiary RENEWABLE ENERGY SOURCES OF KARYSTIA S.A. owns 4 wind farms in operation in Evia, totalling 17 MW.
Acquisition of the company ARGYRITIS LAND S.A., a 65% shareholder of the company KORINTHOS POWER S.A. that owns the CCGT plant of Ag. Theodoroi in Korinthia of 436,6 MW.
Protergia operates in the retail electricity market.
Protergia starts the construction of three wind farms with total capacity 51 MW.
1 Wind Park of 14 MW in the region of Trikorfa (Fokida) enters in operation.
The 2nd wind farm of 23 MW in the region of Sidirokastro Serres, enters in trial operation.
The 2nd wind farm of 11,5 MW in the region of Trizinia Attica , enters in trial operation.
The 3rd wind farm of 15 MW in the region of Sidirokastro Serres, enters in trial operation.
1 Wind Park of 12 MW in the region of Voiotia (Orchomenos) enters in operation.
Merge of «MYTILINEOS HOLDINGS SA» with its principal subsidiaries «METKA S.A.», «PROTERGIA S.A.» and «ALUMINIUM OF GREECE I.C.S.A.»
Protergia operates in the supply of natural gas
1 Wind Park of 48MW in the region of Amfilochia (Aitoloakarnania) enters into trial operation
Protergia new stores in Athens and Thessaloniki
MYTILINEOS/Protergia has created its own aggregator to represent RES and HCHP plants at the electricity market after receiving the 1500 MW Aggregator license from the RAE. Read more
New store in Patras, Riga Fereou 115
New store in Glyfada, L. Dimarxou Aggeloy Metaksa 17