Protergia Business 2 MVP Plus

Large Corporations

Protergia Business 2 MVP Plus is aimed at low-voltage professionals with agreed supply power greater than 25 kVA and up to 250 kVA and offers unique benefits:

Business 2 MVP Plus Header

Benefits

€100 Protergia Refund for payment by the due date*

Without Adjustment Clause even after the suspension period

With a Final Pricing of Power Supply after the State Subsidy from €0.09/kWh

(for January consumptions)

100% Green Energy

Without Power Tariff

Without Additional Subscription

High level service

€30 Protergia Refund for overdue payment*

Participation in State Subsidies

Competitive Tariffs based on Cost

Without guarantee with payment via a standing bank account order.

Without Withdrawal Clause

myprotergia service free of charge:

Consumption control is in your hands!

*The discounts are granted during the term of the contract, in the reconciliation bills and are calculated proportionally to the days of consumption, in proportion to a discount factor of days-reconciliation days/contract duration days (i.e. 730). The consistency and non-consistency discounts are not granted cumulatively.

Pursuant to article 138, Law 4951/2022, for the consumption of the period from 01.08.2022 until 01.07.2023 (as possibly extended or reduced by a recent regulation), the fixed electricity supply tariffs and charges are to be reported on a monthly basis, until the 20th day of the month preceding the month of application.

Competitive charges with effect from 01.08.2022

(For the period of Adjustment Clause suspension, pursuant to Article 138, L. 4951/2022)

Month
of Consumption
Standing charges
(€/month)
Energy tariff
(€/kWh)
Power Tariff (€/ kWh/ month)  State Subsidy through the Energy Transition Fund  (€/kWh)  Final Pricing of Power Supply after the State Subsidy (€/kWh)  Adjustment Clause
up to  35kVA > 35kVA Bakeries Agricultural  up to  35kVA > 35kVA Bakeries Agricultural 
December 2022 5.00 0.38137 0.00 0-2000 kWh 0.03400 0.18300 0.22100 0-2000 kWh 0.34737 0.19837 0.16037 Not applicable
0.18300 0.19837
>2000 kWh >2000 kWh
0.03400 0.34737

The above charges do not include VAT 6%.
It shall apply to new applications up to 31.03.2023 for a 12-month contract 

Charges

The cost of a competitive arm includes energy supply as part of Daily Energy Planning, the charges for the incremental bills (Bill 2, Bill 3), the charges for losses of the Greek electricity distribution grid, the charge based on weighted variable cost of thermal conventional power stations (Special Account Charge under Article 143 L.4001/2011), the charging of charge representatives for the Subaccount of Electricity Market of the Special Account of R.E.S and High Performance Electricity and Heat Co-generation Station of the Interconnected System and Grid (Article 23 L. 4414/2016) and the costs of the Sufficient Power Guarantee Mechanism, as defined in the Code of Electricity Transactions (decision by RAE 56/2012, Government Gazette B 104/2012), and laid down in the applicable legislation.

Competitive charges outside the Suspension period

(For the period outside the Adjustment Clause suspension, pursuant to Article 138, L. 4951/2022)

With Protergia Business 2 MVP Plus you will continue not to be charged an adjustment clause even after the lapse of the suspension period referred to in Article 138, L.4951/2022. For the period outside the suspension of the adjustment clause, pursuant to article 138, L.4951/2022, the calculation of the Variable Pricing of Power Supply is based on the Weighted Market Price each month of the consumption period in €/MWh.

ARE YOU READY FOR THE FUTURE OF ENERGY?

Get start Now!

Fill in your details to get the offer!

The field is mandatory
The field is mandatory
The field is mandatory
The field is mandatory
This field is required*
This field is required*
The field is mandatory
The field is mandatory
You must accept the terms
Change cookies consent Revoke cookies consent